COVENTRY FIVE

This project consists of a single 1.5 MW wind turbine located in Coventry, RI. The turbine is located on land owned by a private landowner with an executed site lease and all permits secured. All construction has been completed and the turbine was interconnected and operational in February of 2017. 

 

LOCATION:
Victory Highway, Coventry, RI

COMMERCIAL OPERATION DATE:
Q1 2017

EQUIPMENT:
(1) Vensys V82 1.5 MW Turbine with 82 meter blades, mounted on an 85 meter tower

ESTIMATED 1ST YEAR
SYSTEM PRODUCTION:
3,150,000 kWh