COVENTRY THREE

This project consists of a single 1.5 MW wind turbine located in Coventry, RI. The turbine is located on land owned by a private landowner with an executed site lease and all permits secured. All construction has been completed and the turbine was interconnected and operational in July of 2016. The Narragansett Bay Commission owns this project and receives net-metering credits for the energy that it produces.

 

LOCATION:
Flat River Road, Coventry, RI

COMMERCIAL OPERATION DATE:
Q3 2016

EQUIPMENT:
(1) Vensys V82 1.5 MW Turbine with 82 meter blades, mounted on an 85 meter tower

ESTIMATED 1ST YEAR
SYSTEM PRODUCTION:
3,199,000 kWh