COVENTRY TWO

This 4.5 MW project consists of three 1.5 MW wind turbines located in Coventry, RI. The turbines are located across two parcels; the first is land owned by the Town of Coventry and the second is a private landowner. Site construction has been completed and the turbines were interconnected and operational in August of 2016. The Town of West Warwick owns and operates this project and receives net-metering credits for the energy produced from this project.

 

LOCATION:
West Log Bridge Road, Coventry, RI

COMMERCIAL OPERATION DATE:
Q3 2016

EQUIPMENT:
(3) Vensys V82 1.5 MW Turbine with 82 meter blades, mounted on an 85 meter tower

ESTIMATED 1ST YEAR
SYSTEM PRODUCTION:
8,715,000 kWh