PROVIDENCE WIND ONE

This project consists of two 1.5 MW wind turbines located on the Johnson & Wales University (JWU) Harborside Campus in Providence, RI. Green Development owns, operates, and maintains the turbines on land leased from JWU. Construction was completed in November 2021, and the turbines are expected to be operational soon.

 

LOCATION:

Johnson & Wales University, Harborside Campus, Providence, RI

COMMERCIAL OPERATION DATE:

TBD

EQUIPMENT:

Two Vensys V82 1.5 MW turbines with 82-meter blades, mounted on 58-meter towers

AVERAGE ANNUAL SYSTEM PRODUCTION:

4,329,000 kWh